|
Laying terastone is no different to the method used for other materials
to be glued to the floor.
|
|
| A |
Firstly, lay
concrete on the area to be covered, making sure that it is perfectly
evened and levelled. |
| B |
Once the concrete is dry,
pour on a layer of adhesive cement and place the tiles on top. |
| C |
The tiles should be completely
level, with no protrusions. |
| D |
Once the tiles have been
laid and after waiting 24 hours, pour the grout over the tiles.
The grout should be similar in colour to that of the tiles. |
| E |
Once the grout has been
poured over the flooring, make sure the joints between each
tile are completely filled, using a rubber brush. |
| F |
Before the grout has dried,
sprinkle on dry cement powder, rub the area using a scrubbing
brush (or similar) and sweep clean. |
|
|
|
|
| Maintaining
terastone |
|
terastone JIMESA is easy to maintain. Use any cleaning
product that is non-corrosive (do not use bleaches, ammonia,
nitric acid, etc.).
We advise you to dilute the cleaning products in water, following
the manufacturer's recommendations.
|
|
|